How much extra should I order?
Order 5% over what you measured. Yards are never rectangles, and every curve, tree ring, and walkway edge costs you a piece off the end of a roll. Coming up half a pallet short is not a same-afternoon fix, because it means booking another cut, and that sod lands 24 to 48 hours after it.
What do I leave out of the measurement?
Only measure what you actually want grass on. Subtract the driveway, the patio, the beds, the pool, and the shed pad. People trace the whole lot and end up with two pallets they have nowhere to put.
How many pallets is my yard?
One pallet covers 450 square feet. Take your square footage, add 5% for trim, divide by 450, and round up. A partial pallet is still a whole pallet, so the last one usually has some left over.
How heavy am I, really?
Confirm the loaded pallet weight before pickup. Check your vehicle’s loading label, rated payload, and axle limits, including passengers, equipment, and other cargo. Truck class does not establish safe pallet capacity. Choose delivery if capacity is uncertain.
Where should the truck set me down?
Somewhere flat, close to the yard, and out of your car's way for a day. The forklift places pallets on the driveway or the curb. Concrete is best: a pallet parked on the lawn for a day leaves a yellow rectangle you will be looking at for weeks.
How long can I sit before you lay me?
Install within 24 hours of delivery, and the same day in summer heat. A stacked pallet cooks from the middle out, so the rolls in the center yellow first. Keep the stack shaded and damp until it goes down.
When should I order for a weekend?
Order by Wednesday. Sod is cut to order, so the farm cuts at first light and it is normally on your driveway 24 to 48 hours from the cut. Rain can push a cut back a day, and we text you the moment we know.
Will the truck actually fit?
Tell us about the gate, the slope, the low branches, and the parked cars before delivery day rather than on it. A flatbed with a forklift on the back needs room to swing. If the only way into the back yard is a narrow side gate, the pallets stop at the driveway and the rest is a wheelbarrow.
What should be done before I show up?
Old turf out, ground graded away from the house, and every sprinkler zone tested. Do it before delivery day, not after. Sod that lands on unprepped clay sits there drying out while somebody goes to rent a sod cutter.
What happens the minute I'm unrolled?
Water promptly after laying, then lift a corner to check that moisture has reached the soil underneath. Check beneath the sod and keep the root zone moist without saturation. Adjust watering to weather and rooting progress, within your water provider’s current rules and any approved allowance.
What do I do with a leftover pallet?
Lay it anyway. The bare strip by the mailbox, the alley side, the dirt under the trampoline. Sod does not keep, so a half pallet left in the driveway on Sunday is a half pallet of compost on Tuesday.
Do I need topsoil under me?
On compacted clay or new-construction fill, yes. An inch across the lawn is about one cubic yard per 324 square feet. Sod on prepped soil roots in 10 to 14 days; sod laid straight onto clay can take a month.